December 2010 through December 2011
Value of work performed: $10,625,000

Relocation of existing utilities lines (water, gas and sanitary lines).  Installation of 2,140 linear feet of storm sewer concrete pipes.  Installation of precast manholes of various sizes (7’, 5’ and 4’ Dia.)  Installation of precast Catch Basins of various types (Type I, II, and III).  Cast in place chamber.  Water main installation of various sizes (8”, 12” and 20”).  Roadway restoration with 8inch concrete base and paved the street.  Installation of concrete curbs and sidewalks.  