Bayonne Berth S-1

Reclamation Environmental
April 2006 through October 2006
Value of work performed: $4,061,500

Bayonne BerthThe Caisson Encasement for the Bayonne Local Redevelopment Authority consists of fiberglass encasements for 168 – 54inch diameter caissons reinforced with arched steel mats and structural concrete having a final diameter of 66 inches. The length of the encasement started directly from the underside of the pre WWII pier into 10 feet below the mud line through the debris from previous piers.